[cs_content][cs_section bg_image=”https://www.marketforces.org.au/wp-content/uploads/2019/09/MF-The-Adani-List-Webpage-Header-v01.jpg” parallax=”true” separator_top_type=”none” separator_top_height=”50px” separator_top_inset=”0px” separator_top_angle_point=”50″ separator_bottom_type=”none” separator_bottom_height=”50px” separator_bottom_inset=”0px” separator_bottom_angle_point=”50″ _bp_base=”4_4″ _label=”Heading + intro” style=”margin: 0px;padding: 40px 0px 100px;”][cs_row inner_container=”true” marginless_columns=”false” _bp_base=”4_4″ _label=”New Item 2″ style=”margin: 0px auto;padding: 0px px;”][cs_column fade=”false” fade_animation=”in” fade_animation_offset=”45px” fade_duration=”750″ _bp_base=”4_4″ type=”1/1″ style=”padding: 0px;margin-bottom:0px;”][x_custom_headline level=”h1″ looks_like=”h1″ accent=”false” id=”the-adani-list” class=”cs-ta-center” style=”color: hsl(0, 0%, 100%);text-shadow: 2px 1px 0 #000; font-size: 80px; margin-top:8%;”]THE ADANI LIST[/x_custom_headline][x_custom_headline level=”h3″ looks_like=”h5″ accent=”false” class=”cs-ta-center” style=”color: hsl(0, 0%, 100%);text-shadow: 2px 1px 0 #000; font-size: 18px; margin-top:25px;”]Companies that could make or break the Carmichael Coal Project[/x_custom_headline][/cs_column][/cs_row][/cs_section][cs_section parallax=”false” separator_top_type=”none” separator_top_height=”50px” separator_top_inset=”0px” separator_top_angle_point=”50″ separator_bottom_type=”none” separator_bottom_height=”50px” separator_bottom_inset=”0px” separator_bottom_angle_point=”50″ _bp_base=”4_4″ _label=”Intro copy” style=”margin: 0px;padding: 25px 0px 0px;”][cs_row inner_container=”true” marginless_columns=”false” _bp_base=”4_4″ style=”margin: 0px auto;padding: 0px;”][cs_column fade=”false” fade_animation=”in” fade_animation_offset=”45px” fade_duration=”750″ _bp_base=”4_4″ type=”1/1″ style=”padding: 0px;”][cs_element_headline _id=”9″ ][cs_content_seo]Construction and engineering companies that are working or have worked with Adani\n\n[/cs_content_seo][/cs_column][/cs_row][cs_row inner_container=”true” marginless_columns=”false” _bp_base=”4_4″ style=”margin: 0px auto;padding: 0px;”][cs_column fade=”false” fade_animation=”in” fade_animation_offset=”45px” fade_duration=”750″ _bp_base=”4_4″ type=”1/1″ style=”padding: 0px;”][cs_text _bp_base=”4_4″ class=”cs-ta-left”]
Adani didn’t build its climate-wrecking coal mine and rail line by itself. It needed help from specialised companies, including engineering design firms and construction contractors.
The companies listed below have helped/are helping Adani trash First Nation land rights, drain critical water resources, risk our already distressed Great Barrier Reef and fuel runaway global warming that threatens all our lives and livelihoods.
Public pressure has so far seen over 100 companies refuse any involvement with Adani, and the list continues to grow. The companies listed below have been given the opportunity to distance themselves from the Carmichael thermal coal project, and they have refused to do so.
[/cs_text][/cs_column][/cs_row][/cs_section][cs_element_section _id=”13″ ][cs_element_layout_row _id=”14″ ][cs_element_layout_column _id=”15″ ][cs_element_headline _id=”16″ ][cs_content_seo]Construction and Engineering Companies that are working or have worked with Adani\n\n[/cs_content_seo][cs_element_text _id=”17″ ][cs_content_seo][table “64” not found /]
\n\n[/cs_content_seo][cs_element_text _id=”18″ ][cs_content_seo]Status of Construction and Engineering companies on Adani's Carmichael thermal coal project (including mine, rail and port).
Company | What it's said/done |
---|---|
Altus Traffic | Traffic control company believed to be providing or have provided services to the Carmichael project. |
Ardent Group | Brisbane based business provided/providing environmental management services for the Carmichael project. |
Austrak (owned by German company Vossloh) | Austrak had a major contract for the Adani Carmichael rail project, to deliver the 730000 concrete sleepers from its Rockhampton center for the 400km rail line that would take the coal from the Carmichael mine to Abbot Point coal port. This railway line proposal was abandoned, with Adani building a 200km narrow gauge line linking to the existing Aurizon network. |
BG&E | Engineering company worked on the design and construction of the 122km section of the 185km rail corridor & associated infrastructure to connect the Carmichael coal mine with the established network near Moranbah. |
BMD | Major construction company contracted to build a section of the Carmichael rail line. |
Calibre | Brisbane based engineering, construction and professional services company. It led on the Carmichael railway line detailed design. Has also done some civil engineering work related to Adani’s plans to upgrade the road to the Carmichael site. |
Caporn Piling | Believed to be providing/have provided services to the Carmichael coal project. |
Caterpillar | Via subsidiary Progress Rail, provided locomotives to Adani-owned Bowen Rail Company for hauling Carmichael mine thermal coal. |
Compass Assurance Services | Provides/provided certification services for Adani Mining and Abbot Point coal port. |
Crawfords Freightlines | Transport company believed to have transported equipment used to construct the Carmichael coal mine. |
CRRC Yangtze Co. | Providing wagons to Adani-owned Bowen Rail Company for hauling of Carmichael mine thermal coal. |
Decmil | Construction company which had a $40m contract to design and construct three temporary camps along the Carmichael rail corridor. |
Diona | Believed to be providing/have provided services to the Carmichael coal project. |
DRA Global | Had a contract to build the coal handling and processing plant and the coal preparation plant ($140m contract) for the Carmichael coal mine. |
Ernst & Young | Multinational professional services company. Auditors for Adani's Australian operations. |
Go West | Australian tour and transport company. Has been awarded a 5 year fleet contract to supply buses to transport mine workers between the airport, workers camp and the mine site. |
Green Acres Hydromulching | Hydromulch spraying and provision of water trucks at the Carmichael mine site. |
Hanson Australia (Heidelberg Cement) | Believed to be working/have worked on the Carmichael coal project. |
Hevilift | Air transport company believed to be providing/have provided services to Adani for the Carmichael project. |
Humes (LafargeHolcim Group) | Pre-cast concrete supplier, believed to have bid to supply pre-cast concrete for the Adani Carmichael coal project. |
Jaws | Construction and mining equipment producer believed to be/been involved with the Adani Carmichael project. |
KPMG | Multinational professional services company. Believed to be providing/have provided strategic assistance to Adani. |
Lantrak | Lantrak was awarded the Major Haulage Contract for the rail alignment works with BMD Constructions for the Western half of the rail corridor at the Carmichael coal mine. |
LW Survey | Company believed to be providing/have provided services to the Adani Carmichael coal project. |
MacKellar Group | "With Mackellar currently providing clear and grub, topsoil removal and a mining box cut we have grown to provide the majority of services at this new mine." |
Martinus Rail | Rail construction company contracted to construct part of the Carmichael rail line. |
Meales | Concrete pumping company working/worked on the Carmichael mine site. |
Mitchell | Water and Gas pipeline company believed to be working/have worked on the Adani Carmichael coal project. |
Moody Civil and Pipes | Pipeline laying company believed to be working/have worked on the Adani Carmichael coal project. |
MPC Kinetic | Mining construction and management company which undertook works at the Carmichael mine site. |
Oracle Aconex | Software company believed to be providing/have provided the Aconex project management software for use on the Adani Carmichael coal project. |
Platinum Blasting | Explosives for the Carmichael coal mine. |
QH&M Birt | Queensland based construction materials and mining services company. |
Rocla (Fletcher Building Group) | Pre-cast concrete supplier and subsidiary of the Fletcher Building Group, believed to have bid to supply pre-cast concrete for the Adani Carmichael coal project. |
SAP | German software company. Media reports indicate that SAP has an Adani Group-wide “business transformation deal”. SAP has refused to say whether its products are being used to facilitate the construction and operation of the Carmichael coal mine and rail line. |
Siemens | Engineering company provided the signaling for the Carmichael rail line through its subsidiary Siemens Mobility. |
SMW Group | Queensland based company provided new Ultrahaul mine truck trays and a bore field maintenance program. |
Sodexo | French multinational provided the hospitality and cleaning services for the rail construction camps. |
Spiecapag (VINCI) | Pipelines company believed to have worked or bid for work on the Adani Carmichael coal project. |
Telstra | Telecommunications company believed to be providing communications links for the Carmichael project. |
Viadux (Reece) | Subsidiary of Reece, believed to have tendered to supply pipes for the Carmichael project. |
Vinidex (Aliaxis) | Pipeline company providing pipes for the Adani Carmichael coal project. |
Wagners | Queensland based construction materials and mining services company. Wagners have a contract with Adani to provide resources for roads, camps, dams and civil works related to the Carmichael coal project. |