rail

Adani’s new plan, November 2018 update

[cs_content][cs_element_section _id="1" ][cs_element_row _id="2" ][cs_element_column _id="3" ][cs_text]5 November 2018 The next six months will be critical for whether Adani’s destructive mega coal mine goes ahead. Thanks to some cost-cutting, on both its proposed...

AECOM cancels grad outreach to avoid Adani questions

[cs_content][cs_element_section _id="1"][cs_element_row _id="2"][cs_element_column _id="3"][cs_text _order="0"]Wednesday 21 March, 2018US-based engineering and design firm AECOM has cancelled most of their graduate outreach program to avoid facing questions and...

Keep Chinese investment out of Adani Carmichael

[cs_content][cs_element_section _id="1"][cs_element_row _id="2"][cs_element_column _id="3"][cs_text]We've found out how Adani plans to finance their mega coal mine. And we have two months to stop it.[/cs_text][x_button size="mini" block="true" circle="false"...

AECOM wants to help Adani rip up the Galilee

US-based design, engineering and construction company AECOM has signed a letter of agreement with Adani to provide the design and surveying required for the Carmichael rail line. Use the form to tell AECOM to ditch its plans to help Adani rip up the Galilee Basin,...